Tompkins County Bridges
School Street
Bridge - McLean - CLOSED
(Updated September 5, 2008) |
Funding: 80% Federal; 15% NY State; 5% Tompkins County. Budgeted County Share: $49,000 Status: NYSDOT has recommended funding the project for construction in 2011. Hydraulic analysis has shown slightly improved flooding conditions would result with the proposed bridge. Schedule: County, State, and Federal approval of preliminary
design by the end of 2008. Construction in 2011.
THIS BRIDGE IS CLOSED (Pedestrian Bridge installed).
This project would build a bridge that is usable for heavy and emergency traffic on or near Red Mill Road, between Freeville and McLean, in the Town of Dryden. The existing bridge on Red Mill Road is narrow and was posted for 5 tons prior to closure. It is a 120-foot span truss that was built in 1887. Lack of funding and concerns of the State Historic Preservation Office have delayed construction. The County is now investigating new funding options. Funding: To be determined. Budgeted County Share: To be determined. Status: The bridge was closed on December 8, 2005, due to extensive deterioration. Replacement design is on hold pending funding. The County is considering elimination of the crossing and moving the bridge to a pedestiran trail among possible project alternatives. Schedule: Select preferred alternative in 2008.
Banks Road Bridge over 6-mile Creek, Town of Caroline. THIS BRIDGE IS CLOSED. This bridge will be replaced as a result of instability due to flooding in June 2006. LaBella Associates of Rochester is preparing the replacement design. Funding: 100% State (SEMO) & Federal (FEMA). Satus: Bridge replacement is underway. The Contractor is Silverline Consruction of Burdett. Schedule: The new bridge should be open to traffic by November 1, 2008. Link: SEMO Report.
Harford Road Bridge over Owego Creek, West Branch, Town of Caroline. THIS BRIDGE IS CLOSED, WITH TEMPORARY BRIDGE ACCESS. Replacement of beams and deck will return this bridge to 2-lane operation. The bridge is jointly owned by Tompkins and Tioga Counties. Funding: 50% Tompkins County & 50% Tioga County. Satus: Construction on the bridge is nearig completion. Approach work and clean-up will continue into mid-September. Schedule: The bridge should re-open by September 10th.
Forest Home Drive Bridge over Fall Creek, Town of Ithaca. This project will rehabilitate the metal truss bridge near the intersection of Caldwell Road (the "upstream bridge"). The bridge will remain a one-lane bridge. Approaches, including extension of sidewalks and a crosswalk at Caldwell Road, will be improved. Funding: 75% Federal; 25% Tompkins County & Town of Ithaca. Budgeted County/Town Share: $293,000 Status: Consultant Erdman-Anthony & Associates of Rochester is evaluating design alternatives. Stakehoulders from County, Town, neighborhood, and Cornell Plantations have met to discuss project scope. Schedule: Construction in 2009.
|
Last updated September 5, 2008.